Teale's Writing Cabin
Preservation Work Undertaken
This fall, Eric Johnson, Kevin Maines, and Tim McMerriman shored up the rear wall of the writing cabin. They replaced the rotted log sill with a concrete footing. Once the concrete cured, native stone was placed in the void to create a waterproof, insect proof, and mouse proof supporting barrier. To direct water away from the cabin, a trench was dug and drainpipe installed. A pressure-treated wood gutter, in keeping with the design and character of the structure, was attached. The team did great work, assuring the cabin will remain in good shape for decades.